{"id":120,"date":"2011-01-14T12:51:52","date_gmt":"2011-01-14T15:51:52","guid":{"rendered":"http:\/\/actiongroup.com.ar\/?p=120"},"modified":"2016-09-28T14:54:35","modified_gmt":"2016-09-28T17:54:35","slug":"curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial","status":"publish","type":"post","link":"https:\/\/actiongroup.com.ar\/en\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/","title":{"rendered":"TPM Facilitator Training Course \u2013 Total Productive Maintenance. Industrial Management System"},"content":{"rendered":"<p><em>&quot;In terms of results, TPM involves reducing work in process, improving productivity, and lowering costs. But the real goal is to develop each individual&#039;s capabilities and thus generate extremely high motivation.&quot;<\/em><\/p>\n<p style=\"text-align: right;\">Michikazu Tanaka (former Daihatsu director)<\/p>\n<p style=\"text-align: right;\"><small>TPM\u00ae is a registered trademark of the Japan Institute of Plant Maintenance.<\/small><\/p>\n<blockquote><p><strong>TPM OBJECTIVE:\u00a0<\/strong>Increase profitability and competitiveness by drastically reducing losses. Promote full participation to increase equipment reliability. Eliminate breakdowns and failures and improve the Availability Index. Ensure the continuous flow of the production process. Extend the period between major shutdowns and optimize asset utilization.<\/p>\n<p><strong><\/strong><strong>ADDRESSED TO: <\/strong>Managers, TPM Coordinators, Training Managers, Pillar Leaders, Continuous Improvement Managers<\/p>\n<p><strong>COURSE OBJECTIVE:<\/strong> Train facilitators with basic knowledge to act as internal disseminators of TPM throughout the company.<\/p>\n<p><strong>FAITH<\/strong><strong>CHA:<\/strong> To be agreed<br \/>\n<strong><\/strong><\/p>\n<p><strong>DURATION:<\/strong> Five days of 8 hours each. 40 hours in total<\/p>\n<p><strong>PLACE:<\/strong> Preferably companies willing to open their facilities for practical application.<br \/>\n<strong><\/strong><\/p>\n<p><strong>CERTIFICATES: <\/strong>Certificates will be awarded exclusively to those who participate with 100% attendance and pass the final test.<br \/>\n<strong><\/strong><\/p>\n<p><strong>MORE INFORMATION:<\/strong> <a href=\"http:\/\/actiongroup.com.ar\/en\/?page_id=127\">See Frequently Asked Questions \u2013 FAQ&#039;s<\/a><\/p><\/blockquote>\n<h3><strong>Syllabus: TPM Facilitators: Total Productive Maintenance (Industrial Management System)<\/strong><\/h3>\n<p><strong>TPM: Fundamental Principles<\/strong><\/p>\n<p>What is TPM? Reasons for Its Success<br \/>\nMain Concepts: Basic Policy \u2013 Approach to Losses<br \/>\nIt is not just a theory, it is a methodology for change.<br \/>\nHistory and Evolution<\/p>\n<p><strong>Autonomous Maintenance Pillar<\/strong><\/p>\n<p>The role of Operations and Maintenance departments (Part 1)<br \/>\n7 Steps of Autonomous Maintenance<br \/>\nStep Audit<br \/>\nKeys to success in the development of autonomous maintenance<br \/>\nHow to advance in 5 \u201cS\u201d with Autonomous Maintenance<\/p>\n<p><strong>Focused Improvement Pillar<\/strong><\/p>\n<p>Concept of Improvement. Kaizen<br \/>\nRelationship between large losses and overall equipment efficiency<br \/>\nConcept of Overall Equipment Effectiveness according to TPM<br \/>\nHorizon Zero concept and its implementation<\/p>\n<p><strong>Education and Training Pillar<\/strong><\/p>\n<p>Training \u2013 Education. Differences and Approaches<br \/>\nThe Role of the Pillar in Program Development<br \/>\nThe Human Resources Area in the implementation of TPM<br \/>\nOne Point Lesson. OJT<br \/>\nWhy Analysis \/ Why<br \/>\nCritical Competencies \u2013 Skills Matrix<br \/>\nCompliance vs. Commitment<br \/>\nEducate in what matters<\/p>\n<p><strong>Planned Maintenance Pillar<\/strong><\/p>\n<p>Classification of Maintenance Activities<br \/>\nThe role of Operations and Maintenance departments (Part 2)<br \/>\nMaintenance Control and Management System<br \/>\nSteps for the development of the Pillar<br \/>\nThe why of data logs.<\/p>\n<p><strong>Quality Maintenance Pillar<\/strong><\/p>\n<p>Quality Control \u2013 Quality Assurance \u2013 Quality Maintenance<br \/>\nProcess Focus \u2013 Product Focus \u2013 Equipment Focus.<br \/>\nBasic concepts of quality maintenance. QM matrix. Infinite looping.<br \/>\nPreconditions for its implementation.<br \/>\nStages of Quality Maintenance Implementation<br \/>\nHow to combine ISO 9001 with Total Productive Maintenance<\/p>\n<p><strong>Pillar of Administrative Areas<\/strong><\/p>\n<p>Autonomous Maintenance in Administrative Areas<br \/>\nThe 7 Steps of Administrative Areas<br \/>\nInformation Factories<br \/>\nHow to advance in 5 \u201cS\u201d for Administrative Areas<\/p>\n<p><strong>Initial Control Pillar<\/strong><\/p>\n<p>Maintenance Prevention Program from its initial phase<br \/>\nBasic concept of Life Cycle Costing<br \/>\nImplementation Steps<\/p>\n<p><strong>Safety, Hygiene and Environment Pillar<\/strong><\/p>\n<p>Strategies to eliminate accidents and pollution<br \/>\nZero Accidents \u2013 Zero Pollution: An Unrealizable Utopia?<br \/>\nThe Heinrich Principle<br \/>\n7 Steps to Implement the Pillar.<br \/>\nHow to Advance in 5 \u201cS\u201d and the SHMA Pillar<\/p>\n<p><strong>TPM in Practice \u2013 The Key to Total Productivity<\/strong><\/p>\n<p>The need for the TPM secretariat<br \/>\nTPM Office \u2013 Promotion Organization<br \/>\nRole of the Management Team<br \/>\nWhere to start?<br \/>\nLink 5 \u201cS\u201d \u2013 TPM<br \/>\nImplementing the 5S creates the culture needed for TPM.<br \/>\nCritical Success Factors<br \/>\nManagement Commitment<br \/>\nTPM to strengthen competitiveness<br \/>\nVisual Management<br \/>\nSteps for Program Development.<br \/>\nInternal Road Map. 12 Implementation Steps.<br \/>\nResults Obtained with TPM<br \/>\nManagement Indicators<br \/>\nTangible Results<br \/>\nIntangible Results<\/p>\n<blockquote>\n<h3>INVESTMENT<\/h3>\n<p>USD 1600 per person.<br \/>\nAsk about discounts for more than 3 participants per company.<br \/>\nThese values are tax-free.<br \/>\nTo schedule courses outside of Argentina, please contact us. <a href=\"mailto:info@actiongroup.com.ar?subject=Contrataci%C3%B3n%20para%20Curso%20Facilitadores%20TPM\">here<\/a><\/p><\/blockquote>\n<div id=\"_mcePaste\" style=\"position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;\">\n<p class=\"MsoNormal\" style=\"font-family: Arial; text-align: left; word-spacing: 2px;\"><span style=\"font-size: 16pt; color: #000080;\"><strong>TPM: Total Productive Maintenance (Industrial Management System)<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p class=\"MsoNormal\" style=\"font-family: Arial,Verdana; line-height: 19px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\">TPM: Fundamental Principles<\/span><\/p>\n<p><span style=\"font-family: Arial;\"> <span style=\"border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\">What is TPM? Reasons for Its Success<br \/>\nMain Concepts: Basic Policy \u2013 Approach to Losses<br \/>\nIt is not just a theory, it is a methodology for change.<br \/>\n<\/span><\/span> <span style=\"font-family: Arial; font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> History and Evolution<\/span><span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\">Autonomous Maintenance Pillar<\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"border-collapse: separate; color: #000000; font-family: 'Arial'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> The role of Operations and Maintenance departments (Part 1)<br \/>\n7 Steps of Autonomous Maintenance<br \/>\nStep Audit<br \/>\nKeys to success in the development of autonomous maintenance<br \/>\nHow to advance in 5 \u201cS\u201d with Autonomous Maintenance <\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\">Focused Improvement Pillar<\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"border-collapse: separate; color: #000000; font-family: 'Arial, Verdana'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial; font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> <span>Concept of Improvement. Kaizen<br \/>\nRelationship between large losses and overall equipment efficiency<br \/>\nConcept of Overall Equipment Effectiveness according to TPM<br \/>\nHorizon Zero concept and its implementation <\/span> <\/span><\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> <span class=\"Apple-style-span\" style=\"font-size: 13px; text-align: left;\"> Education and Training Pillar<\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"font-family: Arial;\"> <span style=\"border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> Training \u2013 Education. Differences and Approaches<br \/>\nThe Role of the Pillar in Program Development<br \/>\n<\/span><\/span> <span style=\"font-family: Arial; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\">The Human Resources Area in the implementation of TPM<br \/>\n<\/span> <span style=\"font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> <span style=\"font-family: Arial;\"> <span style=\"border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> One Point Lesson.<br \/>\nWhy Analysis<\/span><\/span><\/span><span style=\"border-collapse: separate; color: #000000; font-family: 'Arial, Verdana'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"><span style=\"font-family: Arial; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"><br \/>\nCritical Competencies \u2013 Matrix of <\/span><span style=\"font-family: Arial;\"><span style=\"font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\">Skills<br \/>\nCompliance vs. Commitment<br \/>\nEducate in what matters<\/span><\/span><\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> <span class=\"Apple-style-span\" style=\"font-size: 13px; text-align: left;\"> Planned Maintenance Pillar<\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"font-family: Arial; font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> Classification of Maintenance Activities<br \/>\nThe role of Operations and Maintenance departments (Part 2)<br \/>\nMaintenance Control and Management System<br \/>\nSteps for the development of the Pillar<br \/>\nThe why of data logs. <\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> <span class=\"Apple-style-span\" style=\"font-size: 13px; text-align: left;\"> Quality Maintenance Pillar<\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"border-collapse: separate; color: #000000; font-family: 'Arial'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> Quality Control \u2013 Quality Assurance \u2013 Quality Maintenance<br \/>\nProcess Focus \u2013 Product Focus \u2013 Equipment Focus.<br \/>\nBasic concepts of quality maintenance. QM matrix. Infinite looping.<br \/>\nPreconditions for its implementation.<br \/>\nStages of Quality Maintenance Implementation<br \/>\nHow to combine ISO 9001 with Total Productive Maintenance <\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> Pillar of Administrative Areas <\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"font-family: Arial; font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> Autonomous Maintenance in Administrative Areas<br \/>\nThe 7 Steps of Administrative Areas<br \/>\nInformation Factories<br \/>\nHow to advance in 5 \u201cS\u201d for Administrative Areas <\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> <span class=\"Apple-style-span\" style=\"font-size: 13px; text-align: left;\"> Initial Control Pillar <\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"border-collapse: separate; color: #000000; font-family: 'Arial'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> Maintenance Prevention Program from its initial phase<br \/>\nBasic concept of Life Cycle Costing<br \/>\nImplementation Steps<\/span><\/p>\n<p><span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"> <span class=\"Apple-style-span\" style=\"border-collapse: separate; color: #000000; font-family: 'Times New Roman'; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: medium;\"> <span class=\"Apple-style-span\" style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> <span class=\"Apple-style-span\" style=\"font-size: 13px; text-align: left;\"> Safety, Hygiene and Environment Pillar<\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"font-family: Arial; font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> Strategies to eliminate accidents and pollution<br \/>\nZero Accidents \u2013 Zero Pollution: An Unrealizable Utopia?<br \/>\nThe Heinrich Principle<br \/>\n7 Steps to Implement the Pillar.<br \/>\nHow to Advance in 5 \u201cS\u201d and the SHMA Pillar <\/span><\/p>\n<p>&nbsp;<\/p>\n<p class=\"MsoNormal\" style=\"font-family: Arial,Verdana; line-height: 19px; text-align: left;\"><span style=\"font-weight: bold; font-family: Arial;\">TPM in practice \u2013 <\/span><span style=\"font-weight: bold; font-family: Arial;\" lang=\"ES\"> The Key to Total Productivity<\/span><\/p>\n<p><span style=\"font-family: Arial; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> The need for the TPM secretariat<br \/>\n<\/span><span style=\"font-family: Arial;\"> <span style=\"font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> TPM Office \u2013 Promotion Organization<br \/>\n<\/span> <\/span> <span style=\"font-family: Arial,Verdana; font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> <span style=\"font-family: Arial; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\"> Role of the Management Team<br \/>\nWhere to start?<br \/>\nLink 5 \u201cS\u201d \u2013 TPM<br \/>\n<\/span><span style=\"font-family: Arial;\"> <span style=\"font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> Implementing the 5S creates the culture needed for TPM.<br \/>\nCritical Success Factors<br \/>\nManagement Commitment<br \/>\nTPM to strengthen competitiveness<br \/>\nVisual Management<br \/>\n<\/span> <\/span> <span style=\"font-family: Arial; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; font-size: 13px;\">Steps for Program Development.<br \/>\n<\/span><span style=\"font-family: Arial;\"> <span style=\"font-size: 13px; text-align: left; border-collapse: separate; color: #000000; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px;\"> Internal Road Map. 12 Implementation Steps.<br \/>\nResults Obtained with TPM<br \/>\nManagement Indicators<br \/>\nTangible Results<br \/>\nIntangible Results <\/span> <\/span> <\/span><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u201cIn terms of results, TPM involves reducing workloads in\u2026 <\/p>","protected":false},"author":4,"featured_media":131,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_crdt_document":"","footnotes":""},"categories":[6,168],"tags":[181],"class_list":["post-120","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-seminarios","category-tpm-mejora-continua","tag-tpm"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Curso de Formaci\u00f3n de Facilitadores TPM - Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial - Action Group, Education &amp; Consulting<\/title>\n<meta name=\"description\" content=\"&quot;En t\u00e9rminos de resultados, TPM implica reducir el trabajo en proceso, mejorar la productividad y bajar los costos. Pero el verdadero objetivo es\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/actiongroup.com.ar\/en\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Curso de Formaci\u00f3n de Facilitadores TPM - Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial - Action Group, Education &amp; Consulting\" \/>\n<meta property=\"og:description\" content=\"&quot;En t\u00e9rminos de resultados, TPM implica reducir el trabajo en proceso, mejorar la productividad y bajar los costos. Pero el verdadero objetivo es\" \/>\n<meta property=\"og:url\" content=\"https:\/\/actiongroup.com.ar\/en\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/\" \/>\n<meta property=\"og:site_name\" content=\"Action Group, Education &amp; Consulting\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/web.facebook.com\/ActionGroup\/?ref=ts&amp;amp%3bamp%3bamp%3bfref=ts\" \/>\n<meta property=\"article:published_time\" content=\"2011-01-14T15:51:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-09-28T17:54:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/actiongroup.com.ar\/wp-content\/uploads\/2011\/01\/industrial.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"342\" \/>\n\t<meta property=\"og:image:height\" content=\"226\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ing. Ra\u00fal A. Perez Verzini\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@actiongroup_ar\" \/>\n<meta name=\"twitter:site\" content=\"@actiongroup_ar\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ing. Ra\u00fal A. Perez Verzini\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/\"},\"author\":{\"name\":\"Ing. Ra\u00fal A. Perez Verzini\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#\\\/schema\\\/person\\\/137c7a455c4ee5c9817231909390d028\"},\"headline\":\"Curso de Formaci\u00f3n de Facilitadores TPM &#8211; Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial\",\"datePublished\":\"2011-01-14T15:51:52+00:00\",\"dateModified\":\"2016-09-28T17:54:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/\"},\"wordCount\":1252,\"publisher\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiongroup.com.ar\\\/wp-content\\\/uploads\\\/2011\\\/01\\\/industrial.jpg\",\"keywords\":[\"TPM\"],\"articleSection\":[\"Seminarios\",\"TPM \\\/ Mejora Continua\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/\",\"url\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/\",\"name\":\"Curso de Formaci\u00f3n de Facilitadores TPM - Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial - Action Group, Education &amp; Consulting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiongroup.com.ar\\\/wp-content\\\/uploads\\\/2011\\\/01\\\/industrial.jpg\",\"datePublished\":\"2011-01-14T15:51:52+00:00\",\"dateModified\":\"2016-09-28T17:54:35+00:00\",\"description\":\"\\\"En t\u00e9rminos de resultados, TPM implica reducir el trabajo en proceso, mejorar la productividad y bajar los costos. Pero el verdadero objetivo es\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#primaryimage\",\"url\":\"https:\\\/\\\/actiongroup.com.ar\\\/wp-content\\\/uploads\\\/2011\\\/01\\\/industrial.jpg\",\"contentUrl\":\"https:\\\/\\\/actiongroup.com.ar\\\/wp-content\\\/uploads\\\/2011\\\/01\\\/industrial.jpg\",\"width\":342,\"height\":226},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/actiongroup.com.ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Curso de Formaci\u00f3n de Facilitadores TPM &#8211; Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#website\",\"url\":\"https:\\\/\\\/actiongroup.com.ar\\\/\",\"name\":\"Action Group, Education &amp; Consulting\",\"description\":\"Desarrollo Organizacional, Excelencia Operacional, RRHH y Selecci\u00f3n\",\"publisher\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/actiongroup.com.ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#organization\",\"name\":\"Action Group, Education & Consulting\",\"url\":\"https:\\\/\\\/actiongroup.com.ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i1.wp.com\\\/www.actiongroup.com.ar\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/logo.png?fit=342%2C69\",\"contentUrl\":\"https:\\\/\\\/i1.wp.com\\\/www.actiongroup.com.ar\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/logo.png?fit=342%2C69\",\"width\":342,\"height\":69,\"caption\":\"Action Group, Education & Consulting\"},\"image\":{\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/web.facebook.com\\\/ActionGroup\\\/?ref=ts&amp;amp;amp;fref=ts\",\"https:\\\/\\\/x.com\\\/actiongroup_ar\",\"https:\\\/\\\/ar.linkedin.com\\\/in\\\/ra\u00fal-a-perez-verzini-b5213b1\\\/es\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/actiongroup.com.ar\\\/#\\\/schema\\\/person\\\/137c7a455c4ee5c9817231909390d028\",\"name\":\"Ing. Ra\u00fal A. Perez Verzini\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/71f3a07960c5db379bbf9fafe56ae4624863c3fb8ec5f0c2182629c6d51eafd0?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/71f3a07960c5db379bbf9fafe56ae4624863c3fb8ec5f0c2182629c6d51eafd0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/71f3a07960c5db379bbf9fafe56ae4624863c3fb8ec5f0c2182629c6d51eafd0?s=96&d=mm&r=g\",\"caption\":\"Ing. Ra\u00fal A. Perez Verzini\"},\"description\":\"Estudi\u00f3 en Chile, Colombia, Brasil, USA, Canad\u00e1 y Jap\u00f3n los procesos de involucraci\u00f3n de las personas y su impacto en los aumentos de productividad, calidad y rentabilidad. Graduado en Ingenier\u00eda Civil por la Universidad Cat\u00f3lica de C\u00f3rdoba. Director y Consultor de Action Group, Education &amp; Consulting.\",\"sameAs\":[\"http:\\\/\\\/www.linkedin.com\\\/in\\\/raulperezverzini\"],\"url\":\"https:\\\/\\\/actiongroup.com.ar\\\/en\\\/author\\\/raul\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TPM Facilitator Training Course - Total Productive Maintenance. Industrial Management System - Action Group, Education &amp; Consulting","description":"&quot;In terms of results, TPM involves reducing work in process, improving productivity and lowering costs. But the real goal is","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/actiongroup.com.ar\/en\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/","og_locale":"en_US","og_type":"article","og_title":"Curso de Formaci\u00f3n de Facilitadores TPM - Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial - Action Group, Education &amp; Consulting","og_description":"\"En t\u00e9rminos de resultados, TPM implica reducir el trabajo en proceso, mejorar la productividad y bajar los costos. Pero el verdadero objetivo es","og_url":"https:\/\/actiongroup.com.ar\/en\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/","og_site_name":"Action Group, Education &amp; Consulting","article_publisher":"https:\/\/web.facebook.com\/ActionGroup\/?ref=ts&amp%3bamp%3bamp%3bfref=ts","article_published_time":"2011-01-14T15:51:52+00:00","article_modified_time":"2016-09-28T17:54:35+00:00","og_image":[{"width":342,"height":226,"url":"https:\/\/actiongroup.com.ar\/wp-content\/uploads\/2011\/01\/industrial.jpg","type":"image\/jpeg"}],"author":"Ing. Ra\u00fal A. Perez Verzini","twitter_card":"summary_large_image","twitter_creator":"@actiongroup_ar","twitter_site":"@actiongroup_ar","twitter_misc":{"Written by":"Ing. Ra\u00fal A. Perez Verzini","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#article","isPartOf":{"@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/"},"author":{"name":"Ing. Ra\u00fal A. Perez Verzini","@id":"https:\/\/actiongroup.com.ar\/#\/schema\/person\/137c7a455c4ee5c9817231909390d028"},"headline":"Curso de Formaci\u00f3n de Facilitadores TPM &#8211; Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial","datePublished":"2011-01-14T15:51:52+00:00","dateModified":"2016-09-28T17:54:35+00:00","mainEntityOfPage":{"@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/"},"wordCount":1252,"publisher":{"@id":"https:\/\/actiongroup.com.ar\/#organization"},"image":{"@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#primaryimage"},"thumbnailUrl":"https:\/\/actiongroup.com.ar\/wp-content\/uploads\/2011\/01\/industrial.jpg","keywords":["TPM"],"articleSection":["Seminarios","TPM \/ Mejora Continua"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/","url":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/","name":"TPM Facilitator Training Course - Total Productive Maintenance. Industrial Management System - Action Group, Education &amp; Consulting","isPartOf":{"@id":"https:\/\/actiongroup.com.ar\/#website"},"primaryImageOfPage":{"@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#primaryimage"},"image":{"@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#primaryimage"},"thumbnailUrl":"https:\/\/actiongroup.com.ar\/wp-content\/uploads\/2011\/01\/industrial.jpg","datePublished":"2011-01-14T15:51:52+00:00","dateModified":"2016-09-28T17:54:35+00:00","description":"&quot;In terms of results, TPM involves reducing work in process, improving productivity and lowering costs. But the real goal is","breadcrumb":{"@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#primaryimage","url":"https:\/\/actiongroup.com.ar\/wp-content\/uploads\/2011\/01\/industrial.jpg","contentUrl":"https:\/\/actiongroup.com.ar\/wp-content\/uploads\/2011\/01\/industrial.jpg","width":342,"height":226},{"@type":"BreadcrumbList","@id":"https:\/\/actiongroup.com.ar\/curso-de-formacion-de-facilitadores-tpm-mantenimiento-productivo-total-sistema-de-gestion-industrial\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/actiongroup.com.ar\/"},{"@type":"ListItem","position":2,"name":"Curso de Formaci\u00f3n de Facilitadores TPM &#8211; Mantenimiento Productivo Total. Sistema de Gesti\u00f3n Industrial"}]},{"@type":"WebSite","@id":"https:\/\/actiongroup.com.ar\/#website","url":"https:\/\/actiongroup.com.ar\/","name":"Action Group, Education &amp; Consulting","description":"Organizational Development, Operational Excellence, HR and Selection","publisher":{"@id":"https:\/\/actiongroup.com.ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/actiongroup.com.ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/actiongroup.com.ar\/#organization","name":"Action Group, Education &amp; Consulting","url":"https:\/\/actiongroup.com.ar\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiongroup.com.ar\/#\/schema\/logo\/image\/","url":"https:\/\/i1.wp.com\/www.actiongroup.com.ar\/wp-content\/uploads\/2016\/10\/logo.png?fit=342%2C69","contentUrl":"https:\/\/i1.wp.com\/www.actiongroup.com.ar\/wp-content\/uploads\/2016\/10\/logo.png?fit=342%2C69","width":342,"height":69,"caption":"Action Group, Education & Consulting"},"image":{"@id":"https:\/\/actiongroup.com.ar\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/web.facebook.com\/ActionGroup\/?ref=ts&amp;amp;amp;fref=ts","https:\/\/x.com\/actiongroup_ar","https:\/\/ar.linkedin.com\/in\/ra\u00fal-a-perez-verzini-b5213b1\/es"]},{"@type":"Person","@id":"https:\/\/actiongroup.com.ar\/#\/schema\/person\/137c7a455c4ee5c9817231909390d028","name":"Eng. Ra\u00fal A. Perez Verzini","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/71f3a07960c5db379bbf9fafe56ae4624863c3fb8ec5f0c2182629c6d51eafd0?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/71f3a07960c5db379bbf9fafe56ae4624863c3fb8ec5f0c2182629c6d51eafd0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/71f3a07960c5db379bbf9fafe56ae4624863c3fb8ec5f0c2182629c6d51eafd0?s=96&d=mm&r=g","caption":"Ing. Ra\u00fal A. Perez Verzini"},"description":"He has studied people engagement processes and their impact on increased productivity, quality, and profitability in Chile, Colombia, Brazil, the USA, Canada, and Japan. He holds a degree in Civil Engineering from the Catholic University of C\u00f3rdoba. He is Director and Consultant at Action Group, Education &amp; Consulting.","sameAs":["http:\/\/www.linkedin.com\/in\/raulperezverzini"],"url":"https:\/\/actiongroup.com.ar\/en\/author\/raul\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-05-03 22:00:17","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/posts\/120","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/comments?post=120"}],"version-history":[{"count":0,"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/posts\/120\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/media\/131"}],"wp:attachment":[{"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/media?parent=120"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/categories?post=120"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/actiongroup.com.ar\/en\/wp-json\/wp\/v2\/tags?post=120"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}